Is Your City Cracking Down on ERRCS Compliance? Here’s What You Need to Know
As emergency communication requirements tighten across the country, building owners, developers, and facility managers need to stay ahead of ERRCS compliance to avoid costly setbacks and ensure public safety for tenants and first responders.
April 30, 2025
0

As emergency communication requirements tighten across the country, building owners, developers, and facility managers need to stay ahead of ERRCS compliance to avoid costly setbacks and ensure public safety for tenants and first responders.

This guide answers the most pressing questions around Emergency Responder Radio Communication Systems (ERRCS), code enforcement, and how to stay compliant.

1. Why Are Cities Increasing Enforcement?

Across the country, cities are putting more emphasis on in-building wireless communication for one simple reason: first responders need reliable radio coverage in emergencies.

Poor signal coverage inside buildings can delay emergency response and endanger both responders and occupants. This risk has led many jurisdictions to update fire code enforcement and accelerate inspections for ERRCS compliance.

2. What Are Cities Requiring?

Newer construction methods and materials—such as Low-E glass, reinforced concrete, and energy-efficient insulation—can block or degrade emergency radio signals. That’s why Authorities Having Jurisdiction (AHJs) are increasingly requiring ERRCS systems and ongoing testing.

Typical requirements include:

  • ERRCS for new and existing commercial buildings
  • Pre-construction radio frequency (RF) surveys
  • Annual testing and re-certification
  • Full documentation to receive a Certificate of Occupancy (CO)
  • Use of UL 2524-listed equipment and compliance with NFPA 1225 and IFC Section 510

3. Which Cities Are Enforcing ERRCS?

Enforcement is expanding nationwide, particularly in metro areas where public safety departments have adopted newer fire codes.

Below is a map showing where ERRCS are being mandated across the country:

Each jurisdiction has its own set of codes, making it imperative that your ERRCS engineer and contractor thoroughly understand your jurisdiction. A few of the nuances are listed here:

Atlanta, GA

All new commercial construction must meet IFC Section 510 and demonstrate in-building radio coverage. COs will not be issued without ERRCS approval.

Seattle, WA & Oregon State

Structures over 50,000 square feet must ensure reliable radio communication or install a code-compliant ERRCS system.

San Francisco, CA

ERRCS is required under Fire Code Section 511 for most commercial, high-rise, and underground buildings. The San Francisco Fire Department must inspect and approve systems before occupancy.

4. What Happens if My Building Is Not in Compliance?

Failing to meet ERRCS requirements can result in:

  • Delays in obtaining your Certificate of Occupancy (CO)
  • Fines and code violations
  • Risk to life safety in emergencies
  • Expensive retrofits and construction delays
  • Failed inspections and additional permitting headaches

5. How Do I Maintain Compliance?

Staying compliant requires more than a one-time install. Here’s how to stay on track:

  1. Conduct a Signal Survey – Assess your current coverage.
  2. Install a Code-Compliant ERRCS – Use UL 2524-certified equipment.
  3. Perform Annual Testing – Required by most AHJs.
  4. Maintain Documentation – Keep test reports, drawings, and     maintenance records accessible.

 

Need HelpNavigating ERRCS Requirements?

We specialize in supporting building owners and developers with full ERRCS solutions—from RF surveys and system design to testing, installation, and annual re-certification.

Reach out to us for guidance and support on your next project.

Other ERRCS resources: Breaking Down the Most Commonly Asked ERRCS Questions

Don’t Start Your EV Infrastructure Project Without These Three Things
With the right approach, your EV Charging Infrastructure can be a smooth and efficient process
April 28, 2025
0

Getting your property outfitted with EV charging stations comes with its challenges, but with the right approach, it can be a smooth and efficient process. Before you break ground, make sure you have these three key elements in place:

#1. Take All of Your Properties Into Consideration

If you manage multiple locations, planning your EV charging infrastructure holistically can save you time and money. Consider factors like location accessibility, software and management platforms, expected vehicle demand, and long-term scalability. A technology-agnostic EV infrastructure provider will take into account all of your properties to ensure the right EV charging solutions are implemented efficiently across your portfolio.

#2. A Site Evaluation to Avoid Costly Surprises

A comprehensive site assessment is critical before EV charger installation. Without it, you may face unexpected electrical upgrades, permitting delays, or costly trenching work. A professional EV charging infrastructure contractor will evaluate utility coordination, civil construction requirements, and compliance needs, ensuring your site is fully prepared before installation begins.

#3. A Partner to Navigate the Ins and Outs

From permitting and engineering to rebate optimization and long-term maintenance, the right EV charging solutions provider will handle all facets of the project. Choosing a turnkey EV infrastructure partner ensures that every stage—from planning and installation to maintenance and compliance—is streamlined, stress-free, and cost-effective.

Set Your EV Charging Project Up for Success

Avoid delays, unexpected costs, and inefficiencies by working with an experienced EV charging infrastructure provider. Centerline specializes in end-to-end EV charging solutions for multi-family properties, hotels, shopping centers, and fleet solutions, ensuring your project is designed for long-term success. Contact us today to get started!

 

Case Study: Project Management Excellence for Electric School Bus Fleet Charging Infrastructure
Deployment of 30 Level 2 (L2) dual-port EV chargers, supporting a 30-vehicle capacity to facilitate the district’s transition to electric school buses
April 28, 2025
0

Overview:

Centerline partnered with an Illinois School System to modernize transportation by installing comprehensive EV charging infrastructure. The project included the deployment of 30 Level 2 (L2) dual-port EV chargers, supporting a 30-vehicle capacity to facilitate the district’s transition to electric school buses. This scalable solution is part of a broader initiative to develop a reliable and sustainable EV charging network for the region.

Scope of Work:

Centerline executed a turnkey EV infrastructure solution, managing every project phase—from architecture and engineering (A&E) to permitting, civil construction, commercial electrical installation, commissioning, and ensuring compliance with EV rebate and incentive programs. Our approach ensured seamless integration of the new EV charging infrastructure, delivering the project on time and within budget while ensuring the site met EV infrastructure compliance standards.

Challenges & Solutions:

1. Supply Chain Delays: Facing potential year-long lead times for panel procurement, Centerline leveraged industry relationships to commission custom-built electrical panels that met budget and timeline requirements. This proactive approach ensured the fleet EV charging infrastructure was ready for the upcoming school year.

2. Custom Switchgear for Reliability: To ensure reliable, uninterrupted service, a custom switchgear system was developed, including a manual transfer switch for generator use during power outages. This bespoke solution addressed the client's operational continuity needs and ensured the reliability of the EV charging station infrastructure.

3. Efficient Installation with Minimal Disruption: The team implemented an efficient installation strategy by mounting chargers on jersey barriers, reducing the need for extensive trenching and facilitating easier expansion or relocation. Additionally, a modular shipping container was utilized to house all electrical and power components, streamlining the EV charging installation process.

4. Incentive Compliance Management: Centerline meticulously managed the process to ensure full compliance with available EV rebates and incentive programs, optimizing the project's financial viability for the school system and supporting long-term sustainable transportation infrastructure development.

Project Management Excellence:

The entire EV charging infrastructure installation was completed in just seven months, with pre-construction beginning on January 1st and systems operational by August 1st—well in time for the new school year. The timeline included 3.5 months for engineering, permitting, and site assessment, followed by 3 months of construction. A dedicated Project Manager,   and a qualified electrician oversaw every phase of the project, ensuring all utility requirements and EV compliance standards were met while maintaining schedule integrity. Their proactive approach to material ordering and logistics ensured all components were ready for seamless installation.

Centerline’s integrated and self-perform approach to civil and electrical EV infrastructure work enabled strict schedule control and cost efficiency. Close communication and a dedicated on-site management team ensured successful project completion. The result was a fully electrified and operational EV charging station for the school bus fleet, ensuring sustainable, reliable, and efficient student transportation for years to come.

Case Study: ERRCS Installation for a Large-Scale Data Center Campus
Over 500,000 square feet and encompassing three separate facilities—required a fully integrated Emergency Responder Radio Communication System (ERRCS)to meet evolving fire code compliance, pass inspection, and ensure public safety communications could operate reliably inside dense infrastructure
April 28, 2025
0

Location: Santa Clara, CA
Services: ERRCS Design, Installation, Permitting,Testing, and Ongoing Maintenance

Overview

A large, mission-critical data center campus in Santa Clara, CA—spanning over 500,000 square feet and encompassing three separate facilities—required a fully integrated Emergency Responder Radio Communication System (ERRCS)to meet evolving fire code compliance, pass inspection, and ensure public safety communications could operate reliably inside dense infrastructure.

The buildings featured heavy-duty construction, dense racking systems, and substantial battery storage—conditions that create a highly RF-challenged environment where standard radio signals cannot penetrate. This presented significant challenges for meeting IFC 510, NFPA 1225, and UL 2524 compliance standards.

Scope of Work

Centerline delivered a complete turnkey ERRCS solution, managing the project from architecture and engineering through permitting, installation, and maintenance.

Key Deliverables:

  • Custom ERRCS Design spanning all three buildingsAnnual testing and service contract to maintain long-term code compliance
  • Fiber-optic network backbone to reduce RF noise and ensure system stability
  • Integration of an existing system into the new infrastructure
  • Full fire code and AHJ compliance coordination
  • System annunciation installed at each building location

Challenges & Solutions

1. Heavy Construction Materials & RFSignal Loss
The facilities were built using materials that blocked nearly all radio signals. To combat this, our team designed and deployed a fiber-connected ERRCS system, reducing signal degradation and enabling consistent coverage throughout all buildings.

2. Existing System Non-Compliance
An existing ERRCS installed by another vendor had become outdated due to changes in fire code and building structure. Our team retrofitted and integrated the system into the new design—bringing it into compliance within three weeks, avoiding costly fines.

3. Complex Permitting Requirements
Working across multiple buildings, our team coordinated directly with local fire marshals and third-party plan check agencies to streamline permitting and approval, ensuring a smooth, timely installation.

4. Long-Term Compliance Needs
Ongoing maintenance and testing are essential for keeping public safety systems compliant. We established a multi-year service agreement with the operator to provide annual ERRCS testing and preventive maintenance aligned with all AHJ requirements.

Project Outcome

The project was delivered on time and within budget. By connecting all three buildings via a high-performance fiber backbone, we ensured seamless emergency radio coverage across the entire campus—meeting all inspection, permitting, and code requirements.

The customer avoided non-compliance penalties, reduced interference risks, and achieved full ERRCS integration that will remain reliable and up-to-date through our annual support program.

Conclusion

This project demonstrates Centerline’s ability to deliver ERRCS solutions in highly complex, mission-critical environments. From initial design through ongoing support, we help our partners navigate permitting, compliance, and system performance in even the most challenging RF environments.

If you manage or are developing a data center, healthcare facility, or commercial high-rise, our team can help you ensure your building meets public safety communication requirements—on time, in budget, and up to code.

Breaking down the most commonly asked ERRCS questions:
Top ERRCS Questions Answered | ERRCS Compliance, Testing & Code Requirements
April 28, 2025
0

Emergency Responder Radio Communication Systems (ERRCS) are a critical yet often overlooked component of modern building safety and compliance. These systems ensure first responders have reliable, in-building radio coverage during emergencies—and they’re not just helpful, they’re often required by law.

Missing the mark on ERRCS design, installation, or annual testing could delay your Certificate of Occupancy (CO) or lead to costly code violations. We’re breaking down the most frequently asked questions about ERRCS so you can stay compliant and avoid last-minute surprises.

What Is Required for ERRCS Compliance?

To achieve ERRCS compliance, your building must meet radio signal strength thresholds as defined by your localAuthority Having Jurisdiction (AHJ), typically based on IFC (International Fire Code) and NFPA 1225 standards. Your system must:

  • Provide 95%–100% radio coverage in critical areas (stairwells, mechanical rooms, fire command centers)
  • Be UL 2524-listed
  • Pass acceptance testing and annual inspections
  • Include backup power and battery monitoring
  • Be installed by a certified ERRCS integrator

Even if you pass now, future development (like new towers or adjacent construction) can interfere with signal strength—making annual testing a must.

Do I Need an ERRCS in My Building?

Most new commercial buildings, high-rises, educational campuses, healthcare facilities, and underground structures require ERRCS if they can’t demonstrate adequate public safety radio signal coverage throughout the building.

When Is ERRCS Testing Required?

You’ll need to test your system at multiple stages:

  1. During initial construction or retrofit (before CO)
  2. Annually as part of ongoing code compliance
  3. After renovations that could affect RF coverage
  4. When requested by your AHJ or fire marshal

What Jurisdictions Require ERRCS Testing?

ERRCS is mandated by most U.S. cities and counties that follow:

  • International Fire Code (IFC)
  • NFPA 1221 / 1225 standards
  • Local building and fire codes

Cities like New York, Los Angeles, SanFrancisco, Miami, Houston, and Chicago have strict ERRCS testing and certification requirements, and enforcement is growing rapidly across secondary markets as well.

ERRCS vs DAS – What’s the Difference?

While both improve wireless communication, they serve different users:

  • ERRCS (Emergency Responder Radio Communication Systems):
        Supports public safety radio channels for police, fire, and EMS.
  • Commercial DAS (Distributed Antenna System):
        Boosts cellular signals for occupants and tenants.

Many buildings require both systems, and they must remain separate to avoid interference.

Need Help Navigating ERRCS Requirements?

We specialize in ERRCS and DAS design, installation, and annual testing to keep your building safe, compliant, and occupancy ready. Our team understands the nuances of AHJ requirements across jurisdictions and will guide you every step of the way.

Contact us today for a compliance check or quote on ERRCS testing.

These Mistakes Could Cost You More Than You Realize on Your EVCS Project
The demand for EV charging infrastructure is growing rapidly; however, making the wrong choices during EV charging station installation can lead to costly delays, inefficiencies, and missed financial opportunities. Avoid these critical mistakes to ensure a smooth, scalable, and cost-effective project.
April 29, 2025
0

These Mistakes Could Cost You More Than You Realize on Your EVCS Project

The demand for EV charging infrastructure is growing rapidly, but making the wrong choices during your EV charging station installation can lead to costly delays, inefficiencies, and missed financial opportunities. Avoid these critical mistakes to ensure a smooth, scalable, and cost-effective project.

#1: Choosing the Wrong EV Charging Solution

Not all EV charging stations are created equal. Selecting the wrong system can result in:

  • Incompatibility issues – Chargers that don’t align with fleet, tenant, or commercial property needs.
  • Hidden infrastructure costs – Retrofitting electrical systems after installation can be expensive.
  • Limited expansion potential – Choosing the wrong system may hinder future scalability.
  • Missed rebate opportunities – Some systems don’t qualify for EV infrastructure incentives and funding programs.

A technology-agnostic EV infrastructure provider ensures you select the right EV charging solution, whether it’s Level 2 chargers for commercial properties or DC fast charging for high-traffic locations.

#2: Not Optimizing Rebates & Incentives

Failing to leverage EVCS rebate programs and financial incentives through state and utility programs can significantly impact your budget. Common issues include:

  • Higher upfront costs – Not factoring in incentives can lead to unnecessary spending.
  • Delayed funding approvals – Compliance errors can slow down or disqualify applications.
  • Missed savings opportunities – Many rebates operate on a first-come, first-served basis, meaning delays can cost you thousands.

A knowledgeable EV charging solutions provider will ensure that your project meets all compliance standards and secures funding from federal, state, and local sources.

#3: Underestimating Electrical & Utility Requirements

Many property owners move forward with EV charger installation without fully assessing their site’s electrical capacity. This can lead to:

  • Unexpected power upgrades – Additional transformers, switchgear, or panel replacements drive up costs.
  • Delays in utility coordination – Failing to plan for grid integration can result in project hold-ups.

Your EV infrastructure contractor should conduct a full site assessment, coordinate with utilities, and ensure the project is designed for both current and future energy demands.

#4: Poor Site Planning & Charger Placement

Strategic EV charging station placement is crucial for accessibility, efficiency, and future scalability. Common mistakes include:

  • Traffic congestion issues – Poorly placed chargers can create vehicle bottlenecks.
  • Limited ADA compliance – Overlooking accessibility regulations can lead to legal and usability issues.
  • Difficult expansion – Chargers should be positioned with future growth in mind.
  • Network Connectivity – Insufficient connectivity can lead to commissioning failures, resulting in weeks or even months of delays in achieving consistent charging. Additionally, it can incur unexpected costs for network extenders.

Well-planned EV charging infrastructure ensures optimal placement for convenience, compliance, and scalability.

#5: Ignoring Long-Term Maintenance & Support

Many businesses focus solely on EV charging station installation and overlook ongoing maintenance. This can result in:

  • Frequent charger downtime – Lack of upkeep leads to unreliable service.
  • Higher long-term costs – Emergency repairs and replacements add up over time.
  • User dissatisfaction – Non-functional chargers drive away potential customers and tenants.

Partnering with a full-service EV charging provider ensures proactive maintenance, monitoring, and support, keeping your infrastructure operational and efficient.

Avoid Costly Mistakes—Choose the Right Partner

Before you commit to an EV charging infrastructure provider, ensure they can handle everything: technology selection, permitting, engineering, utility coordination, installation, civil construction, and maintenance.

Centerline specializes in turnkey EV charging solutions, delivering scalable, cost-effective infrastructure tailored to meet your property’s needs. Contact us today for a smooth road to electrification!